
Brackish water BWBK-BW-4040 · 2500 GPD (9.5 m³/d)
For brackish-water treatment and industrial water preparation. Compare the membrane area, test flow and salt rejection with your feed-water analysis and installed vessel arrangement.
View product ↗ 
Brackish water BWBK-BW-8040 · 10500 GPD (39.7 m³/d)
For brackish-water treatment and industrial water preparation. Compare the membrane area, test flow and salt rejection with your feed-water analysis and installed vessel arrangement.
View product ↗ 
Fouling-resistant FRBK-BW-4040FR · 2000 GPD (7.6 m³/d)
A fouling-resistant membrane option for reuse-water and challenging feed-water enquiries. Its catalog uses a 34 mil spacer; selection still requires a pretreatment and cleaning review.
View product ↗ 
Ultra-low pressure ULPBK-ULP-8040MR-2 · 10500 GPD (39.7 m³/d)
An ultra-low-pressure RO element for lower-salinity water preparation. Compare its stated test pressure and feed concentration with the BW range before selecting a membrane for an existing pump and vessel layout.
View product ↗ 
Seawater SWBK-C-SW-4040 · 1600 GPD (6.1 m³/d)
A seawater RO element with catalog performance stated under seawater-strength salt and boron test conditions. Evaluate the membrane together with the high-pressure system, intake pretreatment and product-water target.
View product ↗ 
Seawater SWBK-C-SW-400 · 7500 GPD (28.4 m³/d)
A seawater RO element with catalog performance stated under seawater-strength salt and boron test conditions. Evaluate the membrane together with the high-pressure system, intake pretreatment and product-water target.
View product ↗ Questions worth settling early
- Full feed-water analysis
- Required permeate quality
- Pump and array operating range
What to prepare
- Feed-water source, salinity, temperature and analysis
- Required permeate flow, quality and operating hours
- Existing model, dimensions, connectors and pressure vessel
- Element quantity, array layout and delivery destination
Make the scope explicit
Ask the proposal to distinguish equipment supply, civil works, external piping, electrical connections, commissioning, training and consumables. Confirm each responsibility in the project quotation. Items discussed on this website are planning considerations, not an automatic inclusion in every supply package.
A matching model format or similar test flow does not establish interchangeability. Confirm mechanical fit and system performance before replacement.
Discuss your project ↗